The solar system was connected to the grid after only about six weeks of construction. It marks the successful re-entry into the German PV market with its own projects. Green City had previously shifted its focus in photovoltaics to other European countries due to the political framework conditions in the solar market and concentrated in Germany in particular on the construction of wind turbines.

 

  • Power: 950 kWp
  • Annual production: 1,000,000 kWh
  • Households supplied: 320
  • Avoidco-emissions: 614 tons
  • Area: 2 hectares, including compensating areas

 